Housing: Legalization and regularization of the status of a number of entities, individuals and companies in the New Sphinx City

Housing: Legalization and regularization of the status of a number of entities, individuals and companies in the New Sphinx City

According to the in-kind and monetary systems, the criteria for a number of entities, people, and businesses have been legalised and reconciled in the new city of Sphinx, according to Assem Al-Jazzar, Minister of Housing, Utilities, and Urban Communities. He said that in order to finish them by the deadlines, the implementation rates of the ongoing projects in the new city of Sphinx are being accelerated, particularly the infrastructure projects.

The 3,149 acres have been legalised by the monetary system, and the implementation times for investment projects range from two to six years to complete their investment projects in accordance with the agreements reached between the New Urban Communities Authority and the investors, according to Engineer Ahmed Ibrahim Anwar, head of the New Sphinx City Development Authority.

According to the president of the New Sphinx City Authority, a number of entities were reconciled and legalised under the in kind method, resulting in an area of (4000 acres) of land that belongs to the New Urban Communities Authority out of a total of (6,239) acres.

The head of the city authority went over a number of projects being carried out in various fields, including the Sphinx Axis project, which consists of a 16 km long and 200 m wide road connecting the Cairo-Alexandria desert road through the bridge of the high-speed train intersection with the “Sphinx Axis” to the existing tunnel. This project is located north of the Sulaymaniyah assembly.

Up El-Dabaa Road until the regional ring road, describing how this road serves as a significant city service hub and is an essential project within the framework of the new Sphinx projects. It also works to meet traffic needs and service the movement of vehicles on the main Oasis Road, and work has started on the project to implement the electrical supply for lighting The Sphinx Axis (first phase).

He explained that a number of projects, including the building of a water outlet, the extraction of turbid water from the lake, the construction of conveying lines with a length of about 15 km, the necessary cranes, and a purification facility, are being prepared to be launched in the upcoming period.

Drinking water for the new city of Sphinx with a capacity of 50 thousand m 3 / day as an urgent first phase and a total capacity of 200 thousand m 3 / day to serve the city, and the project of Axis of Revolution (first phase) Just one” west of the Cairo-Alexandria Desert Road until its intersection with the Sphinx Corridor, with a length of 1500 km, for the possibility of extending utilities to the city through it, and a project to connect utilities to express train stations, including the train station in the new city of Sphinx, and the service area segment in the city via a water line from Sheikh City Zayed is 800 mm in diameter.

Housing: Several entities, people, and businesses in New Sphinx City have had their statuses legalised and regularised.

About Author

Egypt